Dortmund-Ems Canal spillway
Client
WSV Federal Waterways and Shipping AdministrationServices
Civil engineering | hydraulic engineeringProject volume
approx. € 3.3 millionDas Projekt
As part of the project, the old outlet structure will be demolished and a new outlet structure with a new discharge pipe will be constructed. In the drainage trench, a stapled rubble stone revetment is added to secure the embankment and base. The construction site is located on the outskirts of Greven, parallel to the River Ems.
Hauptmassen
- 450 m² concrete demolition
- 420 m² concrete
- 260 t sheet pile wall
- 4,700 m³ dam
- 2,700 m² rubble stone revetment