Renewal of the shore at Fährplatz, Travemünde

Client
Hanseatic City of Lübeck - Lübeck Port Authority
Einsiedelstrasse 6
23554 Lübeck
Services
Refurbishment
Planner
Lübeck Port Authority
Project volume
approx. € 1.4 million

Das Projekt

Renovation of the shore wall of a marina between the ferry dock and the cruise ship terminal as well as the traffic areas behind it by the construction of a new sheet pile wall with reinforced concrete beam and water stairs as access to the water area in a joint venture. Before starting, the existing system had to be installed as 33 wooden piles incl. superstructure can be dismantled.

Hauptmassen

  • 33 wooden dolphins incl. Dismantle wooden walkway
  • 125 m sheet pile wall profile AZ38-700 N DB incl. Belting
  • 125 m sheet pile wall beam made of precast reinforced concrete elements
  • 1 piece of water stairs
  • 900 m² traffic areas