New construction of the Monheim school center
Client
City of Monheim am RheinTown hall square 2
40789 Monheim on the Rhine
Services
Implementation planning | turnkey constructionArchitect
PASD Architects Feldmeier + WredeProject volume
approx. € 20.7 millionDas Projekt
Depenbrock was awarded the contract to construct a 3-storey school building using conventional construction methods. Two school buildings are connected by a connecting wing with a high standard of finish, including a clinker brick façade and aluminum windows. A canteen with a parents’ café has also been created.
Die Architektur
Demolition of two old schools and new construction to unite two elementary school in one building as a “cluster school”. A three-storey building with a partial basement is being erected. There will be 20 classrooms, 10 group rooms, specialist rooms and an administration area.
Das Energie- und Gebäudekonzept
Heat for space heating and hot water is generated by a brine-to-water heat pump and a gas condensing boiler. 25 boreholes have been drilled for geothermal energy.