DE | Select language
Startseite » Building projects » References » New building CVUA Sigmaringen
reference

CVUA Sigmaringen

Client
State of Baden-Württemberg
Minneggstrasse 1
88214 Ravensburg
Services
Planning | turnkey construction | financing | facility management
Architect
Ernst² from Stuttgart from service phase 4 of HOAI
Project volume
approx. € 12 million

Das Projekt

With the new construction of the Sigmaringen Chemical and Veterinary Investigation Office (CVUA), the second construction phase of the overall concept is being realized. The tender was based on the implementation planning and the turnkey construction based on an approved design.

Depenbrock is responsible for the management of the CVUA Sigmaringen in the area of technical building management for a period of 5 to 20 years after acceptance.

Die Architektur

The The 2nd construction phase of the CVUA Sigmaringen is a laboratory building with additional functions such as administration and social rooms. The architecture and design are based on the design of the first construction phase and consist of a basement, three upper floors and a roof center for the technology.

Das Energie- und Gebäudekonzept

The building was constructed in accordance with EnEV 2009 minus 30%. Heat is supplied by a gas-powered CHP unit and a ventilation system with heat recovery, while cooling is provided by a compression chiller. The lighting is controlled via push-buttons and presence detectors.

Contact us

Contact us now

Ein oder mehrere Felder sind fehlerhaft. Bitte überprüfe diese und versuche es anschließend noch einmal.
Beim Versand ist ein Fehler aufgetreten. Bitte versuche es anschließend noch einmal.