DE | Select language
Startseite » Building projects » References » Aachen fire station
reference

Aachen fire station

Client
City of Aachen
Warehouse road 20
52058 Aachen
Services
Turnkey construction
Architect
Taylor Architects
Project volume
approx. € 4.2 million

Project

As part of the establishment of the Aachen city region, a new joint control center for the city and the city region was built between January 2011 and February 2012 – including vehicle halls, offices and recreation rooms.

Depenbrock realized this project on a turnkey basis as part of a general contractor agreement. The new building received financial support from the Economic Stimulus Program II.

The building was designed to be energy-efficient in accordance with the “Aachen Energy Standard 2010”. In order to achieve this demanding level – based on the passive house standard (maximum 20 kilowatt hours per square meter per year) – a high-performance photovoltaic system was used. The modules were installed both on the roof and suspended from the south façade.

Contact us

Contact us now

Ein oder mehrere Felder sind fehlerhaft. Bitte überprüfe diese und versuche es anschließend noch einmal.
Beim Versand ist ein Fehler aufgetreten. Bitte versuche es anschließend noch einmal.



    Detailed information on the handling of user data can be found in our privacy policy