reference
Hamm Bocksheideweg
Client
Emschergenossenschaft/LippeverbandPlanning/ Construction division
Kronprinzenstr. 24
45128 Essen
Services
General civil engineering | sewer construction | road construction | asphalt constructionProject volume
11.5 million €Das Projekt
In an in-house consortium, Depenbrock Bau and Hecker Bau realized a storage sewer with a downstream rainwater retention basin. The new Bocksheideweg pumping station with underground pressure pipes up to the Hoppeibach high point was built in the adjacent area.
Die Architektur
Das Energie- und Gebäudekonzept
Contact us