DE | Select language
Startseite » Building projects » References » Reactivation of Opel plant 1 site
reference

Reactivation of Opel plant 1 site

Client
Bochum Perspective 2022 GmbH
Viktoriastrasse 10
44787 Bochum
Services
Reactivation
Project volume
3.9 million €

Das Projekt

The site of the former Opel Plant 1 in Bochum-Laer has been extensively reactivated for the establishment of new industries. Until March 2018, Depenbrock Bau was involved in the first construction phase for complex development, sewer and road construction work and provided the necessary civil engineering and specialist foundation engineering services. The sewer construction also included the laying of PE pipes DN 355 to DN 1,200 as solid-wall or profile-wound pipes. House and street drainage pipes were also made of PE material. The construction of six in-situ concrete shafts to a depth of approx. 12 m on existing pipelines should be emphasized. Special drilling equipment weighing 100 tons was required for the up to 15 m deep replacement drillings. Further services: Installation of special and prefabricated shafts weighing up to 34 tons – designed for DN 2,000 pipes and excavation pits with slide rail shoring up to 8.0 m deep.

Contact us

Contact us now

Ein oder mehrere Felder sind fehlerhaft. Bitte überprüfe diese und versuche es anschließend noch einmal.
Beim Versand ist ein Fehler aufgetreten. Bitte versuche es anschließend noch einmal.